Condenser Water Piping Seminar
June 24, 2019 Leave a comment
Two of the insurance industry’s biggest risk groups are builder’s risk and professional liability for architects and engineers. Both of these groups are involved in the design and installation of HVAC as well as process cooling equipment. We recently attended a seminar on the design and installation of condenser water piping. The condensers that are referred to are large pieces of equipment that are used in conjunction with cooling towers and large tonnage refrigeration machines. A number of problems can arise if the piping is not considered correctly. For example, the life of a water circulating pump can be reduced dramatically if the friction loss through the piping exceeds the capability of the pump. In addition, it is possible to introduce air into the suction line of the pump if the tower bypass is not done properly. The net result will be flow instability. Freeze protection can be another problem if not considered carefully. In some applications, water is drained from the tower when subfreezing temperatures are expected. But, if for some reason, water stays in a part of the piping and then freezes, the result will be a burst water pipe. If the failure is not detected prior to start-up, then a large amount of water will escape from the system and clean-up can be become very costly, in addition to the piping repair. These are the kinds of problems for which claims are filed and lawsuits can result.